Support your local hall
Lend a hand and make a real difference for Whangaparaoa groups by volunteering in Whangaparaoa. Whether you love painting, gardening, handywork, or simply want to support community events, there’s always a job that will suit your skills and schedule at Whangaparaoa Hall.
Current Projects
Helping the hall helps all the clubs and groups that use the hall. We can suggest a job that suits you or you may already have an idea or suggestion of your own.
We welcome sponsorship from local businesses and contractors.
Refurbishing the front of the hall
This involves creating a large mural. We already have the timber, the paint and ideas. A 'Living Wall' is planned over the concrete blocks. New advertising for sponsors and a new Whangaparaoa Hall sign.
Improving storage in the hall and the side room
In the side room we plan to make space for two table tennis tables and to do that we need to lift up an existing cupboard. This involves some light carpentry work that we need help with. On the hall stage we have a plan to make some side shelves to lift up lighter items like our Xmas decorations and light tables - so we can make better use of the stage space and more efficient space for the Table Tennis tables and the Slot Car Tables underneath and make better use of the stage space. We have the materials ready.
Completing the kitchen refurbishment
The smaller kitchen that faces the hall has been completely renovated and we are part way through renovating the Side Room kitchen. Currently we are renewing the plumbing and then the floor will be resurfaced with new lino, wooden cabinets inset into the new stainless benches. We are looking for sponsorship to help with the flooring.
Restarting the Community Garden
Over summer we will add mulch to restart the community garden. Recently we pulled up the old garden beds.
The next steps are tidying up, bringing in a truckload of mulch and shifting it over the new garden beds, then planting out. We also plan to set up a water tank to save on water
Refurbishing the outside of the hall
Around the back of the hall we have a new mural that is ready to install. First we need to paint and where needed reclad. We are looking for help and sponsorship here. We have the paint and materials to start progressively painting the outside of the hall starting with the front and south sides, then the west and north. The refurbishment ties in with sponsorship and volunteer participation.
Solar Project
A big part of our cost is electricity. Much of the hall is north facing and ideally suited to solar. Over 2027 we will apply for assistance and sponsorship to make this happen. The planning is underway. We have converted most of our lights inside to LEDs.